Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A contractor is considering buying a new mobile crane for their construction project. The crane costs 2,100,000 TL, where the cost includes the cost

A contractor is considering buying a new mobile crane for their construction project. The crane costs 2,100,000 TL, where the cost includes the cost of tires (10.120.1221). a. Calculate the hourly fixed cost of owning/buying a mobile crane by using the procedure followed by Turkish Ministry of Environment and Urbanism and assuming 8 years of useful service life and 2,000 hours of work per year, and an interest rate of 8%. b. Calculate the hourly fixed cost of owning/buying a crane by using the procedure followed by Turkish Ministry of Environment and Urbanism and assuming 8 years of useful service life and 2,000 hours of work per year, but by considering the cost of tires separately. Assume there are 8 tires and a set of tires costs 56,000 TL and can be used for 2 years. Take maintenance cost as 15% and transportation cost as 5% of depreciation of tire. Calculate the hourly operating cost of owning the loader if the machinery requires 1.20 hrs of operator time and diesel fuel. Also calculate total cost. C. d. The contractor wants to carry out a more detailed analysis for total cost with estimated use conditions and variables as follows: 2,800 hours of work in a year; 20% for interest rate "i"; 10.20 TL/kg for diesel fuel; and consider tires cost separately. e. If you were in the business of renting out construction machinery, how much would you charge on a daily basis if you only provided the machinery and not the operating costs, as well as if you rented the equipment together with labor and fuel costs (lump sum cost to the renter). Following data will be needed in your calculations (19.100.1104): Engine Power = 240 HP Diesel Fuel = 6.54 TL/kg Operator Salary = 26.40 TL/hour Diesel Fuel Consumption = 0.0855 kg/HP FIXED COST TABLE (HOURLY RATE) Depreciation Spare Parts Maintenance and Repair Investment Cost Transportation, Assembly, Disassembly Machinery A/N 0.53 * A/N 0.13* A/N i*(N+1)*A/2N 0.02* A/n Tires At / N1,t 0.15* At/N1,t i*(Nt+1)*At/ 2N1,t 0.05 (At/N1,t)

Step by Step Solution

3.55 Rating (162 Votes )

There are 3 Steps involved in it

Step: 1

a The hourly fixed cost of owningbuying a mobile crane is 12560 TL b The hourly fixed cost of owningbuying a crane is 11040 TL c The hourly operating cost of owning ... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Engineering Economic Analysis

Authors: Donald Newnan, Ted Eschanbach, Jerome Lavelle

9th Edition

978-0195168075, 9780195168075

More Books

Students also viewed these Business Writing questions