A contractor needs to stockpile 650 CY of gravel at a site. The gravel has an angle of repose of 35. If the gravel is

A contractor needs to stockpile 650 CY of gravel at a site. The gravel has an angle of repose of 35.

  1. If the gravel is stored in conical piles 8 ft tall, how wide is the base of each conical pile and how many conical piles are required?
  2. If the gravel is stored in a triangular bank that is 15 ft wide at the base, how tall and long is the spoil bank.

Looking for some assistance as I am unsure how to properly complete without having a Load Factor as well. normally it would be the Bank Volume/Load Factor?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Welcome To Management

Authors: Ryan Hawk, General Stanley McChrystal

1st Edition

1260458059, 978-1260458053

More Books

Students also viewed these General Management questions

Question

2.2) Solve and explain the steps involved. 160 (2 +

Answered: 1 week ago