Question
A cooling load of 12,000 Btu/hr is needed for cryogenic application. To efficiently achieve the low temperature cooling for this application, two refrigeration processes are
A cooling load of 12,000 Btu/hr is needed for cryogenic application. To efficiently achieve the low temperature cooling for this application, two refrigeration processes are connected in cascade configuration, where the heat rejection of the low temperature cycle is the heat input to the high temperature cycle.
If the low temperature cycle has a COP of 3.0. What is the heat rejection of the low temperature cycle?
What is the compressor work for the high temperature cycle, if the high temperature cycles also has a COP of 3.0?
What is the overall COP of the cascade refrigeration system?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started