A cost is considered controllable at a given level of managerial responsibility if the cost has not exceeded the budget amount in the master
A cost is considered controllable at a given level of managerial responsibility if the cost has not exceeded the budget amount in the master budget. O it changes in magnitude in a flexible budget. O the manager has the power to manage the cost within a given time period. O it is a variable cost, but it is uncontrollable if it is a fixed cost.