Question
A dam is built in order to slow the flow of river water into an already half-filled lake. The dam is not perfect however; each
A dam is built in order to slow the flow of river water into an already half-filled lake. The dam is not perfect however; each month, approximately 200 x 10^2 liters of extra water seeps into the lake. An unnaturally large growth in the fish population also displaces the water every 6 months by an additional 50 x 10^2 liters. To slow the eventual flooding the locals remove 100 x 10^3 liters of the water at the end of each year. The lake is initially a volume of 50 x 10^4 liters.
Predict at which month the lake will finally flood (the water lever is greater than/equal to the brim). Also track the water level with a plot.
Describe the input and output:
Input: the given variables that contribute to the change in the water level, as well as the initial level
Output: a prediction of when the lake will flood (in months) and a plot of the water level.
Develop a Matlab solution: First develop a flowchart to help you plan your code. Create the corresponding pseudocode.
Need help with writing this code from the textbook Engineering Computing with Matlab by Dr. Hyunjae Park
Thanks!
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started