A dam is to be constructed to provide a storage reservoir for a flood control project. The table below has descriptions of costs and benefits
A dam is to be constructed to provide a storage reservoir for a flood control project. The table below has descriptions of costs and benefits for five reservoir capacity options:
Reservoir capacity (acre-feet) | Initial construction costs ($ million) | Average annual O&M cost ($ million) | Average annual benefits ($ million) |
50,000 | 4.5 | 0.032 | 0.317 |
100,000 | 5.0 | 0.079 | 0.761 |
150,000 | 8.0 | 0.127 | 1.078 |
200,000 | 14.0 | 0.143 | 1.269 |
250,000 | 22.0 | 0.190 | 1.332 |
Assume the project life = 50 years and i = 6%. Determine the reservoir capacity which:
- Maximizes value of net benefits
- Maximizes the benefit/cost (B/C) ratio
- Maximizes the incremental benefit/cost ratio (DB/DC)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started