A delayed coker is a type of coker whose process consists of heating the residual oil feed to its thermal cracking temperature in a multi

A delayed coker is a type of coker whose process consists of heating the residual oil feed to its thermal cracking temperature in a multi parallel pass furnace. This cracks the long chain heavy carbon and hydrogen molecules of the residual oil into coker gas oil and pet coke. Cracking begins in the furnace, continues in the transfer line, and finishes in the coke drum. (wikipedia definition)
As cracking continues in the drum, gas oil and lighter components are generated in vapor phase and separate from the liquid and solids. The drum effluent is vapor only except for any liquid or solids entrainment, and is directed to a fractionation column where it is separated into the desirable boiling point fractions. Solid coke is deposited in the drum in a porous structure that allows flow through the pores. All solids and uncracked residual liquid produced from the vapor and liquid feed are intended to remain in the drum. After the drum is full of the solidified coke, the hot mixture from the furnace is switched to a second drum. While the second drum is filling, the full drum is steamed to further reduce hydrocarbon content of the pet coke, and then water quenched to cool it. The top and bottom heads of the full coke drum are removed, and the solid pet coke is then cut from the coke drum with a high pressure water nozzle, where it falls into a pit, pad, or sluiceway for reclamation to storage.
Larger cokers have several pairs of tandem drums.
Develop a Plot Plan for the Coker Unit as represented in Module 4 HW 2 PFD.pdf. Show a plan (top) view of each equipment and show all the interconnecting pipe routing shown on the PFD sketch. Some guidelines:
(a) Fired heater should be along the edge of your selected plot space. Other equipment should be it least 50 feet away.
(b) Coke pit should be along edge of plot space adjacent to the coke drums.
(c) Shell and Tube exchangers should have space to pull its tube bundle. You achieve this by leaving one exchanger length of space next to either short end.
(d) There should be it least one pipe rack running down the middle of the plot. All major piping from equipment to equipment should be routed over a pipe rack. The only exception is the suction (inlet) piping to pumps.
(e) Air coolers are normally placed on top of the pipe rack.
(f) All other equipment should be located at grade (i.e. ground)MODULE 3 HOMEWORK PROBLEM 2
COKE DRUMS
20 FT DIA X 95 FT T/T
FRACTIONATOR 15 FT DIA X 120FT T/T
HEATER
25 FT DIA X 50 FT HEIGHT
ACCUMULATR
8 FT DIA X 25FTTT
STRIPPER
3 FT DIA X 60 FT T/T
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Principles And Modern Applications Of Mass Transfer Operations

Authors: Jaime Benitez

3rd Edition

1119042739, 978-1119042730

More Books

Students also viewed these Chemical Engineering questions