A developer wants to finance a project costing $2.25 million with a 70 percent, 20-year loan at an interest rate of 4.5 percent. The

image text in transcribed

A developer wants to finance a project costing $2.25 million with a 70 percent, 20-year loan at an interest rate of 4.5 percent. The project's NOI is expected to be $145,000 during year 1 and the NOI, as well as its value, is expected to increase at an annual rate of 2 percent thereafter. The lender will require an initial debt coverage ratio of at least 1.20. Required: a-1. Would the lender be likely to make the loan to the developer? a-2. Support your answer with a cash flow statement for a five-year period. a-3. What would be the developer's before-tax yield on equity (BTIRR)? b. What would be the maximum loan amount that the lender would make if the debt coverage ratio was 1.20 for year 1? What would be the loan-to-value ratio? (assume annual accrual) c. Assuming conditions in part (a), suppose that mortgage interest rates suddenly increase from 4.5 percent to 6.5 percent. NOI and I value will now increase at a rate of 5 percent. c-1. If the desired DCR is 1.20, will the lender be as willing to make a conventional loan now? c-2. Support your answer with a cash flow statement. Complete this question by entering your answers in the tabs below. Required A1 Required A2 Required A3 Required B Required C1 Required C2 Would the lender be likely to make the loan to the developer? Would the lender be likely to make the loan to the developer? Required At Required A2 >

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Microeconomics

Authors: David Laibson, John List

Global Edition 1st Edition

1292079576, 978-1292079578

Students also viewed these Finance questions

Question

=+d. Derive the IRR of each project.

Answered: 1 week ago

Question

=+c. Calculate the NPV of each project at 9%.

Answered: 1 week ago