A diagram of a manufacturing process is given below. Assume a pull system. Note that the abbreviation AT stands for Activity Time and C stands
- A diagram of a manufacturing process is given below. Assume a pull system. Note that the abbreviation AT stands for Activity Time and C stands for Capacity. Each operation has one FTE (fulltime equivalent = equivalent of one person working full-time) and units are processed individually (i.e., m=1).
- (0.5 pts) What is the capacity of Operation 1?
- (0.5 pts) What is the activity time of Operation 2?
- (0.5 pts) What is the bottleneck?
- (0.5 pts) What is the process capacity?