A district needs 500 MW of power. The only option for this power production is the installation of the solar thermal power plant . Calculate

A district needs 500 MW of power. The only option for this power production is the installation of the solar thermal power plant. Calculate the required mirror surface and the investments (in euros, ) for the heliostat field, receiver and steam generator systems, tower, other components, assembly and commissioning, design engineering consulting miscellaneous. Also calculate the total investment, operation and maintenance cost and power generation costs. Assume that the reference data table for the 30 MW is valid in the required problem.

image text in transcribed

Technical data of the assessed 30 MW solar tower power plant Nominal capacity 30 MW Mirror surface 175,000 m Full-load hours 2,100 h/a Storage capacity 0.5 h Solar share 100 % Technical lifetime 25 a Table 5.4 Mean investment and operation costs as well as resulting power generation costs for the reference solar tower power plant Nominal capacity 30 MW Investments heliostat field 30 Mio. receiver and steam generator system 20 Mio. tower 15 Mio. other components 20 Mio. assembly and commissioning 10 Mio. design, engineering, consulting, miscellaneous 5 Mio. Total 99 Mio. Operation and maintenance costs 1.5 Mio. /a Power generation costs 0.13 /kWh Technical data of the assessed 30 MW solar tower power plant Nominal capacity 30 MW Mirror surface 175,000 m Full-load hours 2,100 h/a Storage capacity 0.5 h Solar share 100 % Technical lifetime 25 a Table 5.4 Mean investment and operation costs as well as resulting power generation costs for the reference solar tower power plant Nominal capacity 30 MW Investments heliostat field 30 Mio. receiver and steam generator system 20 Mio. tower 15 Mio. other components 20 Mio. assembly and commissioning 10 Mio. design, engineering, consulting, miscellaneous 5 Mio. Total 99 Mio. Operation and maintenance costs 1.5 Mio. /a Power generation costs 0.13 /kWh

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Edp Auditing A Functional Approach

Authors: Albert J. Harnois

1st Edition

0132246848, 978-0132246842

More Books

Students also viewed these Accounting questions

Question

Solve each logarithmic equation. 16 log, 2 81

Answered: 1 week ago