A district needs 500 MW of power. The only option for this power production is the installation of the solar thermal power plant . Calculate
A district needs 500 MW of power. The only option for this power production is the installation of the solar thermal power plant. Calculate the required mirror surface and the investments (in euros, ) for the heliostat field, receiver and steam generator systems, tower, other components, assembly and commissioning, design engineering consulting miscellaneous. Also calculate the total investment, operation and maintenance cost and power generation costs. Assume that the reference data table for the 30 MW is valid in the required problem.
Technical data of the assessed 30 MW solar tower power plant Nominal capacity 30 MW Mirror surface 175,000 m Full-load hours 2,100 h/a Storage capacity 0.5 h Solar share 100 % Technical lifetime 25 a Table 5.4 Mean investment and operation costs as well as resulting power generation costs for the reference solar tower power plant Nominal capacity 30 MW Investments heliostat field 30 Mio. receiver and steam generator system 20 Mio. tower 15 Mio. other components 20 Mio. assembly and commissioning 10 Mio. design, engineering, consulting, miscellaneous 5 Mio. Total 99 Mio. Operation and maintenance costs 1.5 Mio. /a Power generation costs 0.13 /kWh Technical data of the assessed 30 MW solar tower power plant Nominal capacity 30 MW Mirror surface 175,000 m Full-load hours 2,100 h/a Storage capacity 0.5 h Solar share 100 % Technical lifetime 25 a Table 5.4 Mean investment and operation costs as well as resulting power generation costs for the reference solar tower power plant Nominal capacity 30 MW Investments heliostat field 30 Mio. receiver and steam generator system 20 Mio. tower 15 Mio. other components 20 Mio. assembly and commissioning 10 Mio. design, engineering, consulting, miscellaneous 5 Mio. Total 99 Mio. Operation and maintenance costs 1.5 Mio. /a Power generation costs 0.13 /kWh
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started