Question
A final packaging area needs improvement. This area has two different packaging options, depending on the product type that is coming through the area. One
A final packaging area needs improvement. This area has two different packaging options, depending on the product type that is coming through the area. One option is to have the product sealed inside of a pouch, the other option is to have the product placed into a tray and sealed. Regardless of the product type (trayed or pouched) the product must go through kit verification. From there the product is either brought to the line for tray sealing or pouch sealing. After a product is sealed in its needed package it is then sent to a quality inspection. . The demand is as follows: Pouched products 2500 units/week. Trayed products 1500 units/week. [assume 5 day work weeks at 8 hours per work day] Due to equipment restrictions only one worker can be placed at the pouch sealing operation and at the tray sealing operation ISE352 Operation Standard Time (seconds/unit) 1. Kit Verify 15 seconds/unit 2. Tray Prep 75 seconds/unit 3. Tray Clean 100 seconds/unit 4. Tray Seal (limit of 1 worker) 15 seconds/unit 5. Pouch Prep 180 seconds/unit 6. Pouch Seal (limit of 1 worker) 15 seconds/unit 7. Quality Inspection 60 seconds/unit a. (11 Points) Determine the allowed times associated with each operation and the number of workers required for each operation to meet demand. b. (2 Points) After distributing workers from part a accordingly, which operation is the bottleneck for trayed production? c. (2 Points) What is the efficiency of the pouched production line? [Assume you are using the number of workers identified in part a]
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started