A firm manufactures a product that undergoes a manufacturing process involving 5 cost driver activities. These activities, their estimated costs, and the expected and actual
A firm manufactures a product that undergoes a manufacturing process involving 5 cost driver activities. These activities, their estimated costs, and the expected and actual activity levels are shown below
Estimated indirect cost | Expected activity (vol. of allocation base) | Actual activity (cost driver units) | |
Engineering | $360,000 | 1,000 engineering hrs. | 1050 engineering hrs. |
Set ups | $45,000 | 200 set ups | 160 set ups |
Production safety | $15,000 | 7,000 inspections | 6500 inspections |
Materials handling | $15,000 | 8,000 parts | 7200 parts |
Quality control | $15,000 | 7,000 inspections | 6500 inspections |
TOTAL | $450,000 |
Part I: Assume overhead is applied to products using the traditional method, on the basis of a single activity, which is engineering.
- Compute the single-activity overhead cost allocation rate. HINT: Ch. 3 Powerpoint, slide 27 (2 points)
- Compute the assignment of overhead cost to the product using the allocation rate you computed in step a), and appropriate activity level data. HINT: Ch. 3 Powerpoint, slide 21 (2 points)
Part II: Assume overhead is applied to products using the ABC (activity based costing method), on the basis of all 5 cost-driver single activities.
- Compute the overhead cost allocation rates for each of the 5 activites. HINT: Ch. 3 Powerpoint, slide 27, in the slide's example the rates are already given, but for this HW case, you will need to compute them yourself. (3 points)
- Compute the assignment of overhead cost to the product using the allocation rates you computed in step a) and appropriate activity level data. HINT: Ch. 3 Powerpoint, slide 21 and slide 31 (3 pts.)
TOTAL 10 points
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance