A firm manufactures a product that undergoes a manufacturing process involving 5 cost driver activities. These activities, their estimated costs, and the expected and actual

A firm manufactures a product that undergoes a manufacturing process involving 5 cost driver activities. These activities, their estimated costs, and the expected and actual activity levels are shown below

Estimated indirect cost

Expected activity (vol. of allocation base)

Actual activity

(cost driver units)

Engineering

$360,000

1,000 engineering hrs.

1050 engineering hrs.

Set ups

$45,000

200 set ups

160 set ups

Production safety

$15,000

7,000 inspections

6500 inspections

Materials handling

$15,000

8,000 parts

7200 parts

Quality control

$15,000

7,000 inspections

6500 inspections

TOTAL

$450,000

Part I: Assume overhead is applied to products using the traditional method, on the basis of a single activity, which is engineering.

  1. Compute the single-activity overhead cost allocation rate. HINT: Ch. 3 Powerpoint, slide 27 (2 points)
  2. Compute the assignment of overhead cost to the product using the allocation rate you computed in step a), and appropriate activity level data. HINT: Ch. 3 Powerpoint, slide 21 (2 points)

Part II: Assume overhead is applied to products using the ABC (activity based costing method), on the basis of all 5 cost-driver single activities.

  1. Compute the overhead cost allocation rates for each of the 5 activites. HINT: Ch. 3 Powerpoint, slide 27, in the slide's example the rates are already given, but for this HW case, you will need to compute them yourself. (3 points)
  2. Compute the assignment of overhead cost to the product using the allocation rates you computed in step a) and appropriate activity level data. HINT: Ch. 3 Powerpoint, slide 21 and slide 31 (3 pts.)

TOTAL 10 points

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost-Benefit Analysis For Public Sector Decision Makers

Authors: Diana Fuguitt

1st Edition

1567202225, 9781567202229

More Books

Students also viewed these Accounting questions

Question

5. How quickly can we manage to collect the information?

Answered: 1 week ago

Question

3. Tactical/strategic information.

Answered: 1 week ago

Question

3. To retrieve information from memory.

Answered: 1 week ago