A firm that produces wood shutters and bookcase has received two orders for shutters: one for 100 shutters and one for 150 shutters. The
A firm that produces wood shutters and bookcase has received two orders for shutters: one for 100 shutters and one for 150 shutters. The 100-unit order is due at the start of week 4 of the current schedule, and the 150-unit order is due for delivery at the start of week 8. Each shutter consists of 4 slatted wood sections and two frames. The wood sections are made by the firm, and fabrication takes one week. The frames are ordered, and lead time is two weeks. Assembly for the shutters requires one week. There is a schedule receipt of 70 wood sections in (ie: at the beginning of) week 1. Determine the size and timing of planned-order releases necessary to meet delivery requirements under each of these conditions. (a) (b) Lot-for-lot (ie: order size equal to net requirements) ordering for wood shutters and bookcase. Lot-size ordering with a multiple lot size of 320 units for frames and 70 units for wood sections. Given the information above, you are required to: Develop a product structure tree for the shutters (b) Perform MRP calculations for the product.
Step by Step Solution
★★★★★
3.48 Rating (164 Votes )
There are 3 Steps involved in it
Step: 1
To determine the size and timing of plannedorder releases necessary to meet delivery requirements for the wood shutters we need to use Material Requirements Planning MRP MRP is a systematic approach t...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started