Question
A grocery chain is considering the installation of a set of 4 self-checkout lanes. The new self-checkout lane setup will replace 2 old cashier lanes
A grocery chain is considering the installation of a set of 4 self-checkout lanes. The new self-checkout lane setup will replace 2 old cashier lanes that were staffed by a cashier and bagger on each lane. One cashier mans all 4 self-checkouts (answering questions, checking for un-scanned items, taking coupons, etc). Checkout on the new lanes takes 2 minutes (customers bag their own orders) while checkout with the old lanes took only 45 seconds. In addition the electricity costs for both setups are $.05 per checkout while bagging (material) costs are $.1 per checkout with the old system and $.15 for the new system. The new lanes also require $100 in capital costs. Assume that the lanes are always in use for 8 hours per day (1 shift) and that a worker makes $10/hour.
a. How many checkouts did the old system provide in a shift?
b. How many checkouts does the new system provide?
c. What is the multifactor productivity for each system?
Step by Step Solution
3.38 Rating (148 Votes )
There are 3 Steps involved in it
Step: 1
2 lanes8 hours3600 secondshour1 checkout45 seconds 1280 checkouts 4 lanes8 hours60 m...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3