Question
A hospital is considering building a clinic. Two years ago the board had a feasibility study done for $25,000 that indicated it was likely a
A hospital is considering building a clinic. Two years ago the board had a feasibility study done for $25,000 that indicated it was likely a profitable venture. The land would get $100,000 if sold in todays market. Constructing and equipping the clinic will be $4,000,000. Management believes the center will generate17,500 visits per year. In Year 1, revenue is expected to be $125 per visit, supply cost will be $25 per visit and labor cost (which will not vary with volume) will be $750,000. Inflation is projected at 3% per year after that. The hospitals corporate cost of capital is 7.50%.
A. Construct a five-year cash flow analysis for this project (i.e. Years 0 to Year 5) and include initial cash outflows, revenue, supply cost, labor cost and net cash flow. What is the NPV for this project? what is the volume of visits that will generate a breakeven NPV for the project?
B. If the hospital proceeds with the project, the hospital will lose about 750 visits at an existing on-site clinic. In Year 1, these visits are projected to bring in $75 per visit. How does this change, if at all, your analysis from above?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started