Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A new product is being designed that has two components that will require machining on a CNC milling machine. Component A takes 4.4 minutes and

image text in transcribed

A new product is being designed that has two components that will require machining on a CNC milling machine. Component A takes 4.4 minutes and Component B takes 6.1 minutes. The machine is estimated to run at 90% efficiency and 85% reliability. Set up a spreadsheet to calculate the number of milling machines required to produce 250 parts per day if the machines are expected to be operated for 7.5 hours during an 8-hour shift. Calculate the number of CNC machines required under the following conditions: a. Each CNC machine is operated for 1 shift b. Each CNC machine is operated for 2 shifts C. All CNC machines operate for 1 shift and don't have any idle time. Your solution to (c) will require running the machines overtime to meet the demand. d. Calculate the number of hours of overtime per machine (using the number of machines in part (c)) that would be needed to meet the demand. Each machine will be leased for a cost of $1100/day and operators are paid $30/hour for an 8-hour shift, and $40/hour for each hour of overtime. e. Determine the cost of each option (1 shift, 2 shifts, 1 shift + overtime) f. Identify which option you would recommend and explain why. A new product is being designed that has two components that will require machining on a CNC milling machine. Component A takes 4.4 minutes and Component B takes 6.1 minutes. The machine is estimated to run at 90% efficiency and 85% reliability. Set up a spreadsheet to calculate the number of milling machines required to produce 250 parts per day if the machines are expected to be operated for 7.5 hours during an 8-hour shift. Calculate the number of CNC machines required under the following conditions: a. Each CNC machine is operated for 1 shift b. Each CNC machine is operated for 2 shifts C. All CNC machines operate for 1 shift and don't have any idle time. Your solution to (c) will require running the machines overtime to meet the demand. d. Calculate the number of hours of overtime per machine (using the number of machines in part (c)) that would be needed to meet the demand. Each machine will be leased for a cost of $1100/day and operators are paid $30/hour for an 8-hour shift, and $40/hour for each hour of overtime. e. Determine the cost of each option (1 shift, 2 shifts, 1 shift + overtime) f. Identify which option you would recommend and explain why

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managerial Accounting An Introduction To Concepts Methods And Uses

Authors: Michael W. Maher, Clyde P. Stickney, Roman L. Weil, Sidney Davidson

7th Edition

0030259630, 978-0030259630

More Books

Students also viewed these Accounting questions