Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A plant in Wollongong is treating 7 0 metric tonnes of ore having 1 2 g T of gold and 2 2 0 g T

A plant in Wollongong is treating 70 metric tonnes of ore having 12gT of gold and 220gT of silver
in each batch. The solid tailings contained 0.6g??TAu and 35gTAg after the leaching processes, and
it is discarded after washing. The charge that enters the precipitation tank contains 300T solution.
The precipitation is 100% complete. The total reagent used is 55kgchargeKCN and 40kgcharge
Zinc.
Elsner Equation:
2Au+4KCN+O+H2O=2KAu(CN)2+2KOH Equation 1Or
4Au+8CN+O2+2H2O=4Au(CN)2+4OH-Equation2
Precipitation Equation:
KAu(CN)2+2KCN+Zn+H2O=Au+K2Zn(CN)4+2H++KOH
For Equations 1 and 2 above, Au and KCN are interchangeable with Ag and NaCN.
Given
At. wt. of Au=196.9,K=39,Zn=65.39,Ag=107.9,C=12 and
N=14gmol
(j). Calculate the efficiency of leaching for Au and Ag.
(ii). The grade of solution entering the precipitation tank.
(iii). Percentage of KCN used in the actual dissolution of gold.
(iv). Percentage of Zn used in the actual precipitation of gold.
image text in transcribed

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Chemical Engineering questions