Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A plant using plant-wide overhead and machine-hours for the overhead application rate is considering switching to an activity-based costing (ABC) overhead costing method. Total overhead
A plant using plant-wide overhead and machine-hours for the overhead application rate is considering switching to an activity-based costing (ABC) overhead costing method. Total overhead was $620,000 for a period that contained two jobs. Job 1 used 8,000 machine-hours; job 2 used 12,000 machine-hours. New data groups overhead costs into three pools for job 1: utilities measured by machine-hours at a predetermined driver rate of $10/machine-hour, materials handling of 60,000 pounds at a rate of $3/pound, and 200 setups at a rate of $300/setup. For job 1, what amount is allocated using the plant-wide and ABC methods? Plant-wide: $310,000; ABC overhead costing: $320,000. Plant-wide: $310,000; ABC overhead costing: $372,000. Plant-wide: $248,000; ABC overhead costing: $320,000. Plant-wide: $248,000; ABC overhead costing: $372,000
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started