Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A pork-processing facility is considering installing either a storage facility or a holding pond. A biosystems engineer has been hired to evaluate the economic trade-offs

A pork-processing facility is considering installing either a storage facility or a holding pond. A biosystems engineer has been hired to evaluate the economic trade-offs for the two alternatives. The engineer estimates the cost of the storage facility to be $213,000, with annual costs for maintenance to be $3,200 per year. She estimates the cost of the pond to be $90,000, plus $45,000 for pumps and piping; annual operating and maintenance costs for the holding pond are estimated to be $8,500. The engineer estimates the life of the storage facility and the pond to be around 20 years but is concerned about the accuracy of this estimate. She decides to do a sensitivity analysis.

Click here to access the TVM Factor Table Calculator

1)

Develop the equation she should use to determine how sensitive the economic decision is to changes in life. Use a MARR of 15%.

Equation that can be used to determine the sensitivity is

213,000 + 3,200(P|A 15%,n) - ((90,000 + 45,000) + 8,500(P|A 15%,n))

image text in transcribed

Determine which alternative is preferred for lives ranging from 15 to 25 years in 1 year increments

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Making Dreams Come True Realestate Agent

Authors: Be Mi Real Estate Store

1st Edition

B0BW35VNST

More Books

Students also viewed these Finance questions

Question

Find the derivative of y= cos cos (x + 2x)

Answered: 1 week ago

Question

What is the best conclusion for Xbar Chart? UCL A X B C B A LCL

Answered: 1 week ago

Question

Why does message development not begin with a creative idea?

Answered: 1 week ago

Question

What are the most important points to make in a creative brief?

Answered: 1 week ago