A process is set up with three stations A, B and C in a straight line. The flow rate for A to B is 10
A process is set up with three stations A, B and C in a straight line. The flow rate for A to B is 10 at a cost of $10/hour, for B to C 20 at a cost of $10/hour and for A to C 40 at a cost of $20/hour