Question
A production system specializes in sheet metal fabrication. A wide variety of parts are fabricated for assembly. One simple part involves shearing a small flat
A production system specializes in sheet metal fabrication. A wide variety of parts are
fabricated for assembly. One simple part involves shearing a small flat blank from coil
stock. The material is fed to a stop and then the shear is engaged to cut the length
dimension. Next, the sheared strip is moved to a second shear and placed against the stop,
the second shear is engaged, and the cut to width is produced. The sheared-off metal is
recycled. The part is then moved to the next operation, a break operation for a bend. The
sheet metal part specifications and targets are as follows:
Length specifications: 6+ 0.04 inches.
Width specifications: 4+ 0.05 inches.
Length target: 6.001 inches.
Width target: 3.990 inches.
Data were collected in sub-groups of four parts, where each part is measured for both
length and width (see Tables 2 and 3).
(A)Construct appropriate control charts for the measured characteristics, assume
assignable causes can be eliminated and revise the limits.
(B) Calculate the process capability indices: Cp, Cpk and Cpm. Any suggestions for
process improvement?
(C) If a 5% reduction in the variability of the width or the length are possible under
current budget, which one would you recommend?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started