A project has estimated annual net cash flows of $70,000 for four years and is estimated to cost $190,000. Assume a minimum acceptable rate
A project has estimated annual net cash flows of $70,000 for four years and is estimated to cost $190,000. Assume a minimum acceptable rate of return of 10%. Use the Present Value of an Annuity of $1 at Compound Interest table below. Present Value of an Annuity of $1 at Compound Interest Year 6% 10% 12% 15% 20% 1 0.943 0.909 0.893 0.870 0.833 2 1.833 1.736 1.690 1.626 1.528 3 2.673 2.487 2.402 2.283 2.106 4 3.465 3.170 3.037 2.855 2.589 5 4.212 3.791 3,605 3.353 2.991 6 4.917 4.355 4,111 3.785 3.326 7 5.582 4.868 4.564 4.160 3.605 8 6.210 5.335 4.968 4.487 3.837 9 6.802 5.759 5.326 4.772 4.031 10 7:360 6.145 5.650 5.019 4.192 Determine (1) the net present value of the project and (2) the present value index. If required, use the minus sign to indicate a negative net present value. Net present value of the project (round to the nearest dollar) Present value index (rounded to two decimal places)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance