Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A project is proposed on a 1200sm lot area. Currently, the lot consists of flat vegetation surface with an existing imperviousness of less than 50%.

A project is proposed on a 1200sm lot area. Currently, the lot consists of flat vegetation surface with an existing imperviousness of less than 50%. The proposed design is to meet LEED SS Credit 6.1 - Rate and Quantity - Option 1. In your first design submission of 2 storey building , which consists of 690 sm of conventional roof and 120sm of concrete and asphalt paving area was rejected as the total imperviousness area exceeded 50%. Which of the following design solution improves the site imperviousness to less than 50%? Design 1: Change 20% of the Conventional Roof area to Garden Roof (<10cm) surface type and 50% of the concrete pavement area to Gravel. Design 2: Change the entire concrete pavement area (120sm) to Gravel and keep the building roof as conventional. Design 3: Propose 50% of the Roof area as Garden Roof (<10cm) and keep the pavement area as concrete. Refer Runoff Coefficient below

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Managing Operations Across The Supply Chain

Authors: Morgan Swink, Steven Melnyk, Janet L. Hartley, M. Bixby Cooper

4th Edition

1260547639, 978-1260547634

More Books

Students also viewed these General Management questions

Question

Describe the linkages between HRM and strategy formulation. page 80

Answered: 1 week ago