A project should be accepted if the firms required rate of return is: A) greater than the internal rate of return B) less than the
A project should be accepted if the firms required rate of return is:
A) greater than the internal rate of return
B) less than the internal rate of return
C) is equal to the internal rate of return
D) both b and c