A project team should have roughly 1. 10-12 full time contributors 2. 10-20 months overall duration 3. 20 or more people 4. 300-400 lowest-level activities
A project team should have roughly 1. 10-12 full time contributors 2. 10-20 months overall duration 3. 20 or more people 4. 300-400 lowest-level activities in the work breakdown structure C B, C, and D C All of the above None of the above