Question
A study reveals the following steps in the assembly of a truss (small triangle of three small pieces within a large triangle of three larger
A study reveals the following steps in the assembly of a truss (small triangle of three small pieces within a large triangle of three larger pieces): Forklift delivers 2 4 pieces of pine from outside storage area (20 min). Bandsaw operator cuts six pieces to appropriate length (10 min). Assembler #1 gets three short pieces, bolts small triangle (5 min). Assembler #2 gets three long pieces, bolts large triangle (10 min). Assembler #3 gets one of each triangle and fastens into truss (20 min). Supervisor inspects complete truss and prepares for delivery (5 min). a. Complete a flow process chart of the operation. b. What are the %Idle time and production for an unbalanced, linear assembly line? c. Balance the assembly line using appropriate workstations. What are the %Idle time and production now?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started