Question
A surfboard manufacturer makes small and large surfboards. The production process has three stages: assembly, finish, and inspection. Each small surfboard requires 3 hours to
A surfboard manufacturer makes small and large surfboards. The production process has three stages: assembly, finish, and inspection. Each small surfboard requires 3 hours to assemble, 2 hours to finish, and 1 hour for inspection. Each large surfboard requires 4 hours to assemble, 3 hours to finish, and 1.5 hours for inspection. There are 140 hours available for assembly, 100 hours to finish, and 50 hours for inspection. The large surfboard makes $150 profit per board. The small surfboard makes $100 profit per board.
Linear programming will be used to create the weekly production schedule.
What would the objective function be for this problem if S = number of small surfboards produced and L = number of large surfboards produced?
its a study problem that I would like to see worked out so I can apply it to other questions .
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started