Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

A temporary diversion has been constructed on a highway of+4 percent grade due to major repairs that are being undertaken on a bridge. The maximum

A temporary diversion has been constructed on a highway of+4 percent grade due to major repairs that are being undertaken on a bridge. The maximum speed allowed on the diversion is 20 mi/h. Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. Assume that a driver can read a road sign within his or her area of vision at a distance of 30 ft for each inch of letter height.

Speed limit on highway = 65 mi/h

Letter height of road sign = 8 in.

Perception-reaction time = 2.5 sec

Step by Step Solution

3.39 Rating (158 Votes )

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Cost Benefit Analysis Concepts and Practice

Authors: Anthony Boardman, David Greenberg, Aidan Vining, David Weimer

4th edition

137002696, 978-1108448284, 1108448283, 978-0137002696

More Books

Students also viewed these Civil Engineering questions

Question

5. What is the role of human judgment in selection decisions?

Answered: 1 week ago