Answered step by step
Verified Expert Solution
Question
1 Approved Answer
A time study of a manufacturing operationyielded the following times for one element of a jobfor which the analyst gave a performance rating of 1.17.Using
A time study of a manufacturing operationyielded the following times for one element of a jobfor which the analyst gave a performance rating of 1.17.Using an allowance of 20 percent work time, determine the appropriate standard time for this operation. Observation Timex (minutes) Observation TIme, x(minutes) 1 1.16 7 1.14 2 1.19 8 1.16 3 1.2 9 1.18 4 1.13 10 1.12 5 1.17 11 1.18 6 1.13 12 1.16 Determine Normal Time (NT).a) 1.16 minutes b) 1.30 minutes c) 1.36 minutes d) 1.45 minutes e)None of the above
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started