A typical dentist's office has a complicated mix of dental procedures and significant setup times; thus, it is similar to a job shop. Suppose a dentist works a 9-hour day with one hour for lunch and breaks. During the first six months the practice is open, he does all the work, including cleaning and setting up for the next dental procedure. Setup and processing times for three procedures are shown in the Microsoft Excel Online file below. Also shown are the number of appointments and demand for each type.
On a particular day, there are two scheduled first appointments for single tooth crowns (see last column of the table in the Microsoft Excel Online file below), two second appointment for a single tooth crown, four tooth-whitening appointments, two first appointments for a partial denture, and one third appointments for a partial denture. Assume there is one setup time per dental procedure to set up and clean the equipment and room before the next patient arrives. Is there sufficient capacity to perform all the work?
Dental Procedure | Appointments Setup or Changeover Time (Minutes) | Processing Time (Minutes) | Demand (No. of Patients Scheduled) | |||
Single tooth crown 1st appt. | 20 | 95 | 2 | |||
Single tooth crown 2nd appt. | 10 | 30 | 2 | |||
Tooth whitening | 10 | 30 | 4 | |||
Partial denture 1st appt. | 5 | 40 | 2 | |||
Partial denture 2nd appt. | 15 | 30 | 0 | |||
Partial denture 3rd appt. | 10 | 30 | 1 |
Open the spreadsheet and perform the required analysis to answer the questions below.
Open spreadsheet
Questions
1. What is the total setup time?
fill in the blank ? minutes
2. What is the total processing time?
fill in the blank ? minutes
3. What is the total time?
fill in the blank ? minutes
4. What percentage of the total capacity is used to set up and change over from one dental procedure to the next? Round your answer to two decimal places.
fill in the blank ? %
5. What percentage of the total capacity is spent on dental procedures. Round your answer to two decimal places.
fill in the blank ? %
6. Is there sufficient capacity to perform all the work?
Yes, there is sufficient capacity. No, there is a capacity shortage.
table {mso-displayed-decimal-separator:"\."; mso-displayed-thousand-separator:"\,";} tr {mso-height-source:auto;} col {mso-width-source:auto;} td {padding-top:1px; padding-right:1px; padding-left:1px; mso-ignore:padding; color:black; font-size:10.0pt; font-weight:400; font-style:normal; text-decoration:none; font-family:Arial, sans-serif; mso-font-charset:0; text-align:general; vertical-align:bottom; border:none; white-space:nowrap; mso-rotate:0;} .xl17 {color:windowtext; font-weight:700; vertical-align:middle;} .xl18 {color:windowtext; vertical-align:middle;} .xl19 {color:windowtext;} .xl20 {color:windowtext; font-weight:700; text-align:center; vertical-align:middle;} .xl21 {color:windowtext; font-weight:700;} .xl22 {color:windowtext; background:#F4B084; mso-pattern:black none;} .xl23 {color:windowtext; vertical-align:middle; background:#9BC2E6; mso-pattern:black none;} .xl24 {color:windowtext; vertical-align:middle; background:#A9D08E; mso-pattern:black none;} .xl25 {color:windowtext; vertical-align:middle; background:#A9D08E; mso-pattern:black none;}
Capacity Measurement | |||||||
Total | Total | ||||||
Work Order | Setup Time | Processing Time | Order Size | Setup Time | Processing Time | Total Time | |
Single tooth crown 1st appt. | 20 | 95 | 2 | 40 | 0 | ||
Single tooth crown 2nd appt. | 10 | 30 | 2 | 20 | 60 | ||
Tooth whitening | 10 | 30 | 4 | 40 | 120 | ||
Partial denture 1st appt. | 5 | 40 | 2 | 10 | 80 | ||
Partial denture 2nd appt. | 15 | 30 | 0 | 0 | 0 | ||
Partial denture 3rd appt. | 10 | 30 | 1 | 10 | 30 | ||
Total | |||||||
Percentage | |||||||
Formulas | |||||||
Total | Total | ||||||
Setup Time | Processing Time | Total Time | |||||
=B5*D5 | =C5*E5 | #N/A | |||||
=B6*D6 | =C6*D6 | #N/A | |||||
=B7*D7 | =C7*D7 | #N/A | |||||
=B8*D8 | =C8*D8 | #N/A | |||||
=B9*D9 | =C9*D9 | #N/A | |||||
=B10*D10 | =C10*D10 | #N/A | |||||
Total | #N/A | #N/A | #N/A | ||||
Percentage | #N/A | #N/A | #N/A | ||||
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started