Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

According to the data given find the question below (a) assume and justify a bucket turning angle, and calculate the bucket efficiency; (b) calculate the


According to the data given find the question below

(a) assume and justify a bucket turning angle, and calculate the bucket efficiency;

(b) calculate the velocity and diameter of the jets;

(c) calculate the average radius of the Pelton wheel;

(d) deduce the head loss in the system upstream of the turbine; and

(e) compare and contrast the net head at the turbine with the rated head of the facility.

 

Using the Poatina Power Station Fact Sheet provided below for technical specifications; for the Fuji Pelton turbine:

The Poatina Power Station is part of the Great Lake Power Scheme. It houses six Siemens generators coupled to Pelton turbines. When the station was commissioned in 1966 there were only five turbines. The sixth was added in 1977. Between 2007 and 2010 number 1, 4 and 5 machines were upgraded under a program to modernise the ageing plant. The station is underground on the northern side of the lake with its machine hall 150 metres below the surface.

Water from yingina / Great Lake travels through a 5.6 kilometre-long headrace tunnel to a single, hydraulically operated hilltop valve. A 105 metre-long, steel lined penstock tunnel leads to the penstock tunnel portal. Water is then carried via a 1.8 kilometre-long surface penstock to a 150 metre vertical shaft leading to the underground penstock distributor.

The penstock distributor has six branches, each feeds an isolating valve inside the power station which is bolted directly to the main turbine inlet valves. The rated head for the station is 758 metres.

Once it leaves the turbines the water is discharged along a 4 kilometre tailrace tunnel exiting at Palmers River. Poatina supplies irrigation water to the Cressy-Longford Irrigation Scheme and Macquarie Irrigation with minimum required flows set for the summer period.

The station output is fed to TasNetworks' transmission grid via underground circuit breakers to two 16 kV/110 kV and four 16 kV/220 kV generator transformers located in the switchyard above. Poatina's positioning in the network means it feeds into the Palmerston switchyard, which is on the main North-South transmission corridor.

Scheme: Great Lake - South Esk

Year commissioned: 1966/1977

Power station structure: Underground dimensions: 91 m long x 14 m wide and 26 m high excavation It houses generating sets with assembly bay and services bay and with a vertical busbar/ lift shaft to a surface control building and transformer yard.

Static head: 835 m

Generating set: Six vertical shaft generating sets:

Five Boving 51.6 MW of which three are upgraded Andritz turbines

One Fuji 54.5 MW four nozzle spear Pelton. All units are capable of operating at over 60 MW. Turbines directly coupled to a 3-phase, 50 Hz, 62.5 MVA synchronous generator and with provisions for synchronous compensator operation.

Turbine manufacturer: 2 Boving, 3 Andritz, 1 Fuji

Generator manufacturer: Siemens

Rated head: 758 m

Rated output: 62.5 MVA

Rated discharge: 9 m3/s

Power factor: 0.8

Rated speed: 600 rev/min

Rated voltage: 16 kV


Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Business Analytics

Authors: Vernon Richardson, Marcia Watson

1st Edition

1265454345, 9781265454340

More Books

Students also viewed these Mechanical Engineering questions