ATEN a.P. production enterprise production; Energy Center the service Goes where the garage go to the service and quality control to go to the

ATEN a.P.” production enterprise production; “Energy Center” the service Goes where “the garage” go to the service and “quality control ” to go to the service goes to support three and “cutting edge” based on where it goes, “bend” and goes to the main “ASSEMBLY” process based on three realizes that goes over what goes where.

General production expenses were subject to the first distribution of expenses and the following results were obtained:

First Expense Distribution Result
Cutting is the main expense location............................ …. 49.500. TL.
Bending is the main expense.............................. 37.500. TL.
Installation is the main expense location............................. 95.000. TL.
Energy Center Service expense location...... 416.000. TL.
Repair shop service expense location.................. 50.600. TL.
Quality Control Service expense location . 150.800. TL.
Total Overall Production Expense.......................... 799.400. TL.

In the enterprise, general production expenses collected at the service expense locations as a result of the first expense distribution will be subject to the second expense distribution. The following distribution keys and distribution relationships table will be used when this is performed:

Energy Center H.G.Y. Tamir H.G.Y. Quality Control H.G.Y
Distribution Switch: Kiloamper (ka) number of machines (Mk.) Direct labor time (DIS))
DISTRIBUTION RELATIONS TABLE:

MAIN EXPENSE LOCATIONS SERVICE EXPENSE LOCATIONS

Cutting Bending Assembly Energy Mrk. Repair Quality Control

Service Expense LocationsG.Y. EGY EGY H.G.Y . H.G.Y. Total

Energy Center HGY 14,000 ka 1,000 ka 30,000 ka 2,000 ka 1,500 ka 2,200 ka 50,700 ka

Repair shop HGY 12 Mk 16 Mk 6 Mk 8 Mk. 4 Mk. 4 Mk. 50 Mk.

Quality control HGY 400 DIS 700 DIS 650 DIS -------- ------- 100 DIS 1.850 DIS

Desired : as The Cost Accountant of the Enterprise, distribute the overall production costs to the transaction expense locations according to the “gradual distribution method”and the result of the second expense distribution;

Cut main expense specify the general production expenses collected at the site.
Bending main expense specify the general production costs collected at the site.
Installation main expense specify the general production expenses collected at the site

Step by Step Solution

3.45 Rating (145 Votes )

There are 3 Steps involved in it

Step: 1

The cutting main expense specifies the general production expenses collected at the site Th... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Operations Management

Authors: William J Stevenson

12th edition

2900078024107, 78024102, 978-0078024108

More Books

Students also viewed these Mechanical Engineering questions

Question

How do you add two harmonic motions having different frequencies?

Answered: 1 week ago