Answered step by step
Verified Expert Solution
Question
1 Approved Answer
LX = 90 LB = 65 LC =510 LD =124 OX =465 OA =72 OB =84 OC =3116 OD =168 OE =112 Product X has
LX = 90
LB = 65
LC =510
LD =124
OX =465
OA =72
OB =84
OC =3116
OD =168
OE =112
Product X has the product structure given below. For 1 unit of X, 1 unit of A and 2 units of B are required. 1 unit of A is composed of 1 unit of C and 1 unit of D. For 1 unit of B, 3 units of C are required. For 1 unit of C, 1 unit of E is required. A 2) C (3) E E Suppose that the batch size for the assembly of X is LX units. The assembly is done as multiples of this batch size. Currently, we have OX units of X on hand. The company does not keep safety stock for X. The planning horizon is 8 weeks ahead. Assume that there is no lead time for X. In addition, relevant details for each component are in the table below. Component A C D E EOQ=LC EOQ=LB units At least LD Lot size policy Lot-for-lot Lot-for-lot units units On-hand OA units OB units OC units OD units OE units inventory Lead time 1 2 1 2 1 (in weeks) Safety stock 100 500 (to be None 50 100 (to be None 70 Scheduled received at the received at the None None None beginning of Week2) beginning of Week3) receipts
Step by Step Solution
★★★★★
3.35 Rating (161 Votes )
There are 3 Steps involved in it
Step: 1
a First compute the Projected available balance PAB and Net requirement NR as follows without enteri...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started