Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Action-Capture Camera Design Image Sensor Size 8mm 9mm 10mm 11mm 12mm 13mm 14mm diagonal LCD Display Screen 230k 460k 610k 920k 1040k 1230k 2360k pixels

Action-Capture Camera Design

Image Sensor Size 8mm 9mm 10mm 11mm 12mm 13mm 14mm diagonal
LCD Display Screen 230k 460k 610k 920k 1040k 1230k 2360k pixels
Image Quality (maximum resolution) 19201080 19201440 27041520 27042028 38402160 38402400 40962160 pix.
Number of Photo Modes (video / still) 4 / 3 6 / 3 7 / 3 8 / 3 10 / 4 12 / 4 16 / 4 modes
Product Enhancements Camera Housing $ 4 5 6 7 8 9 10 11 12 13 14 15 16 per camera
Editing / Sharing Capabilities $ 4 5 6 7 8 9 10 11 12 13 14 15 16 per camera
Included Accessories $ 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 per camera
Extra Performance Features 2 3 4 5 6 7 8 9 10 features
Number of AC Camera Models 1 2 3 4 5 6 7 models
Product R&D Expenditures (Y5 was $20,000) $ 0 3000 6000 9000 12000 16000 20000 24000 28000 32000 36000 40000 45000 50000 ($000s)
Cumulative R&D Expenditures (all years) $65,000 ($000s)
Performance / Quality Rating (P/Q Rating ranges from 1-10 stars) 6.1
Projected AC Camera Production Costs $000s $/unit
Image Sensor 14,493 15.00
LCD Display Screen 20,773 21.50
Image Quality 20,290 21.00
Photo Modes 22,223 23.00
Camera Housing 14,493 15.00
Editing / Sharing Capabilities 13,527 14.00
Included Accessories 12,561 13.00
Extra Performance Features 38,648 40.00
Total Cost of Components and Features 157,008 162.50
Assembly Labor Costs 25,083 25.96
Product R&D Expenditures 20,000 20.70
Allowance for Warranty Repairs 4,130 4.27
Maintenance of Plant and Equipment 15,434 15.97
Depreciation of Plant and Equipment 9,983 10.33
Total Camera Production/Assembly Cost 231,638 239.74
Projected Unit Assembly Regular Overtime Total
AC Camera Unit Assembly (000s) 959.0 7.2 966.2

UAV Drone Design

Built-In Camera No Upgrade Minor Upgrade Significant Upgrade Major Upgrade
GPS / WiFi / Bluetooth Basic Enhanced Advanced Best Available
Battery Pack (maximum flight time) 8 10 12 15 18 21 25 30 minutes
Number of Rotors 4 6 8 rotors
Rotor Performance / Flight Controller Basic Enhanced Advanced Best Available
Body Frame Construction High-Strength Plastic g10/FR4 Fiberglass Carbon Fiber
Obstacle Sensors Front Only Front/Rear 360 Basic 360 Enhanced 360 Advanced 360 Best Available
Camera Stabilization Device Basic Enhanced Advanced Best Available
Extra Performance Features 2 3 4 5 6 7 8 9 10 11 12 13 14 15 features
Number of UAV Drone Models 1 2 3 4 5 6 7 models
Product R&D Expenditures(Y5 was $15,000) $ 0 3000 6000 9000 12000 15000 18000 21000 24000 27000 30000 35000 40000 45000 50000 ($000s)
Cumulative R&D Expenditures (all years) $57,000 ($000s)
Performance / Quality Rating (P/Q Rating ranges from 1-10 stars) 5.4
Projected UAV Drone Production Costs $000s $/unit
Built-In Camera 43,639 283.74
GPS / WiFi / Bluetooth 11,535 75.00
Battery Pack 15,380 100.00
Rotors / Performance / Controller 10,151 66.00
Body Frame Construction 2,615 17.00
Obstacle Sensors 6,921 45.00
Camera Stabilization Device 2,768 18.00
Extra Performance Features 31,375 204.00
Total Cost of Components and Features 124,384 808.74
Assembly Labor Costs 7,973 51.84
Product R&D Expenditures 27,000 175.55
Allowance for Warranty Repairs 4,470 29.06
Maintenance of Plant and Equipment 10,585 68.82
Depreciation of Plant and Equipment 5,913 38.45
Total Drone Production/Assembly Cost 180,325 1,172.46
Projected Unit Assembly Regular Overtime Total
UAV Drone Unit Assembly (000s) 153.8 0.0 153.8

Student Decisions & Report

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Information Systems Management

Authors: Barbara McNurlin

8th Edition

0132437155, 9780132437158

More Books

Students also viewed these General Management questions