Question
Activity-Based And Department Rate Product Costing and Product Cost Distortions Black and Blue Sports Inc. manufactures two products: snowboards and skis. The factory overhead incurred
Activity-Based And Department Rate Product Costing and Product Cost Distortions
Black and Blue Sports Inc. manufactures two products: snowboards and skis. The factory overhead incurred is as follows:
Indirect labor | $507,000 |
Cutting Department | 156,000 |
Finishing Department | 192,000 |
Total | $855,000 |
The activity base associated with the two production departments is direct labor hours. The indirect labor can be assigned to two different activities as follows:
Activity | Budgeted Activity Cost | Activity Base | ||||
Production control | $237,000 | Number of production runs | ||||
Materials handling | 270,000 | Number of moves | ||||
Total | $507,000 |
The activity-base usage quantities and units produced for the two products follow:
Number of Production Runs | Number of Moves | Direct Labor Hours-Cutting | Direct Labor Hours-Finishing | Units Produced | ||||||||||||||||
Snowboards | 430 | 5,000 | 4,000 | 2,000 | 6,000 | |||||||||||||||
Skis | 70 | 2,500 | 2,000 | 4,000 | 6,000 | |||||||||||||||
Total | 500 | 7,500 | 6,000 | 6,000 | 12,000 |
Required:
1. Determine the factory overhead rates under the multiple production department rate method. Assume that indirect labor is associated with the production departments, so that the total factory overhead is $315,000 and $540,000 for the Cutting and Finishing departments, respectively. Round per unit amounts to the nearest whole cent.
Department | Production Department Rate |
Cutting Department | $fill in the blank 1 per direct labor hour |
Finishing Department | $fill in the blank 2 per direct labor hour |
2. Determine the total and per-unit factory overhead costs allocated to each product, using the multiple production department overhead rates in (1). Round per unit amounts to the nearest whole cent.
Product | Total Factory Overhead | Factory Overhead Per Unit |
Snowboards | $fill in the blank 3 | $fill in the blank 4 |
Skis | $fill in the blank 5 | $fill in the blank 6 |
3. Determine the activity rates, assuming that the indirect labor is associated with activities rather than with the production departments. Round per unit amounts to the nearest whole cent.
Activity | Activity Rate |
Production Control | $fill in the blank 7 per prod. run |
Materials Handling | $fill in the blank 8 per move |
Cutting Department | $fill in the blank 9 per dlh |
Finishing Department | $fill in the blank 10 per dlh |
4. Determine the total and per-unit cost assigned to each product under activity-based costing. Round the per unit amounts to the nearest whole cent.
Product | Total Activity Cost | Activity Cost Per Unit |
Snowboards | $fill in the blank 11 | $fill in the blank 12 |
Skis | $fill in the blank 13 | $fill in the blank 14 |
5. Comment on the difference in the per-unit overhead allocated to each product under the multiple production department factory overhead rate and activity-based costing methods.
The activity-based overhead allocation reveals that _____(snowboards/skis)____ consume more factory overhead on a per-unit basis than do ____(snowboard/ski)____ . The __(activity based/multiple production)____ method does not show this because all factory overhead is assumed to be proportional to direct labor hours. The ___(activity based/multiple production factory)____ method separately accounts for the production control and materials handling activity costs. Snowboards have more production control and materials handling activities than do skis. This is because snowboards are made in smaller lots, representing a wide variety of styles. Thus, snowboards have higher activity costs per unit than skis.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started