Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Activity-Based Costing, Lean Operations, and the Costs of Quality Please use cell references Will give HUGE thumbs up for help B D E F G

Activity-Based Costing, Lean Operations, and the Costs of Quality

image text in transcribed

image text in transcribedPlease use cell references

Will give HUGE thumbs up for help

B D E F G H K L 2 Use ABC to allocate manufacturing overhead 3 Several years after reengineering its production process, Dettling Corporation hired a new controller, Alana Metzgar. She developed an ABC system very similar to the one used by Dettling's chief rival. Part of the reason Metzgar developed the ABC system was because Dettling's profits had been declining, even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, the 4 company had used a plantwide overhead rate based on direct labor hours that was developed years ago. 5 6 For the upcoming year, Dettling's budgeted ABC manufacturing overhead allocation rates are as follows: 7 Activity Cost 8 8 Activity Allocation Base Allocation Rate 9 Materials handling Number of parts $ 4.50 per part 10 Machine setup Number of setups $ 325.00 per setup Insertion of parts 11 Number of parts $ 31.00 per part Finishing direct labor 12 Finishing hours $ 51.00 per hour 13 16 The number of parts is now a feasible allocation base because Dettling recently installed a plantwide computer system. 14 Dettling produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows: 15 Standard Deluxe Units Expected production for each model 1,000 18 Parts per wheel 6.0 19 Setups per 1,000 wheels 20.0 20.0 Finishing direct labor hours per wheel 1.0 3.0 21 Total direct labor hours per wheel 2.7 3.8 17 4.0 20 22 23 Use the blue shaded areas on the ENTERANSWERS tab for inputs. 24 Always use cell references and formulas where appropriate to receive full credit. 25 26 Requirements 27 1 Compute the total budgeted manufacturing overhead cost for the upcoming year. 28 2 Compute the manufacturing overhead cost per wheel of each model using ABC. 29 3 Compute the company's traditional plantwide overhead rate. Use this rate to determine the manufacturing overhead cost per wheel under the traditional system. 30 INSTRUCTIONS ENTERANSWERS + D E F G H 1 j K 1 1. Compute the total budgeted manufacturing overhead cost for the upcoming year. 2 (Always use cell references and formulas where appropriate to receive full credit.) 3 Total Budgeted 4 Activity Indirect Cost 5 Materials handling 6 Machine setups 7 Insertion of parts 8 Finishing 9 Total budgeted indirect costs 10 11 2. Compute the manufacturing overhead cost per wheel of each model using ABC. 12 (Always use cell references and formulas where appropriate to receive full credit.) 13 14 Activity Allocated Activity Cost Per Wheel 15 Standard Deluxe 16 Materials handling 17 Machine setups 18 Insertion of parts 19 Finishing 20 Total ABC allocated indirect cost 21 22 3. Compute the company's traditional plantwide overhead rate. 23 (Always use cell references and formulas where appropriate to receive full credit.) 24 25 Plant overhead rate per direct labor hour 26 27 Use this rate to determine the manufacturing overhead cost per wheel under the traditional system. 28 29 Manufacturing overhead cost per wheel 30 Standard 31 Deluxe 32 33 34 35 36 INSTRUCTIONS ENTERANSWERS + B D E F G H K L 2 Use ABC to allocate manufacturing overhead 3 Several years after reengineering its production process, Dettling Corporation hired a new controller, Alana Metzgar. She developed an ABC system very similar to the one used by Dettling's chief rival. Part of the reason Metzgar developed the ABC system was because Dettling's profits had been declining, even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, the 4 company had used a plantwide overhead rate based on direct labor hours that was developed years ago. 5 6 For the upcoming year, Dettling's budgeted ABC manufacturing overhead allocation rates are as follows: 7 Activity Cost 8 8 Activity Allocation Base Allocation Rate 9 Materials handling Number of parts $ 4.50 per part 10 Machine setup Number of setups $ 325.00 per setup Insertion of parts 11 Number of parts $ 31.00 per part Finishing direct labor 12 Finishing hours $ 51.00 per hour 13 16 The number of parts is now a feasible allocation base because Dettling recently installed a plantwide computer system. 14 Dettling produces two wheel models: Standard and Deluxe. Budgeted data for the upcoming year are as follows: 15 Standard Deluxe Units Expected production for each model 1,000 18 Parts per wheel 6.0 19 Setups per 1,000 wheels 20.0 20.0 Finishing direct labor hours per wheel 1.0 3.0 21 Total direct labor hours per wheel 2.7 3.8 17 4.0 20 22 23 Use the blue shaded areas on the ENTERANSWERS tab for inputs. 24 Always use cell references and formulas where appropriate to receive full credit. 25 26 Requirements 27 1 Compute the total budgeted manufacturing overhead cost for the upcoming year. 28 2 Compute the manufacturing overhead cost per wheel of each model using ABC. 29 3 Compute the company's traditional plantwide overhead rate. Use this rate to determine the manufacturing overhead cost per wheel under the traditional system. 30 INSTRUCTIONS ENTERANSWERS + D E F G H 1 j K 1 1. Compute the total budgeted manufacturing overhead cost for the upcoming year. 2 (Always use cell references and formulas where appropriate to receive full credit.) 3 Total Budgeted 4 Activity Indirect Cost 5 Materials handling 6 Machine setups 7 Insertion of parts 8 Finishing 9 Total budgeted indirect costs 10 11 2. Compute the manufacturing overhead cost per wheel of each model using ABC. 12 (Always use cell references and formulas where appropriate to receive full credit.) 13 14 Activity Allocated Activity Cost Per Wheel 15 Standard Deluxe 16 Materials handling 17 Machine setups 18 Insertion of parts 19 Finishing 20 Total ABC allocated indirect cost 21 22 3. Compute the company's traditional plantwide overhead rate. 23 (Always use cell references and formulas where appropriate to receive full credit.) 24 25 Plant overhead rate per direct labor hour 26 27 Use this rate to determine the manufacturing overhead cost per wheel under the traditional system. 28 29 Manufacturing overhead cost per wheel 30 Standard 31 Deluxe 32 33 34 35 36 INSTRUCTIONS ENTERANSWERS +

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Interpreting Company Reports And Accounts

Authors: Geoffrey Holmes, Alan Sugden, Paul Gee

10th Edition

0273711415, 9780273711414

More Books

Students also viewed these Accounting questions