Activity-Based-Costing (ABC) is a cost allocation system that is designed to allocate overhead costs to activities and then assigns those costs to products. Which of
Activity-Based-Costing (ABC) is a cost allocation system that is designed to allocate overhead costs to activities and then assigns those costs to products. Which of the following is NOT associated with ABC?
A. | Cost driver | |
B. | Activity center | |
C. | Cost objects | |
D. | Full absorption |
Step by Step Solution
There are 3 Steps involved in it
Step: 1