Additional work consists of work that must be undertaken to fulfill contract requirements. Which of the following criteria should be met for work to be
Additionalwork consists of work that must be undertaken to fulfill contract requirements. Which of the following criteria should be met for work to be consideredextrawork?
Work that was necessary but now shown on the in the contract documents
Work that was necessary because of a labor slowdown as a result of a dispute with the contractor on the job.
Work that is outside and entirely independent of the contract.
Work that was not reasonably anticipated, not open to observation, and not readily discovered until the work started.
Afieldchangeis typically issued for work that changes the costorthe duration of a project.
True
False
Which statement about a "cardinal change" is correct?
A cardinal change falls within the scope of the original contract
A cardinal change can be considered a breach of contract
A cardinal change is a change beyond the original scope of work and includes changes in size and/or time, but does never includes changes in the process nor the sequence of the work.
The contractor already working on a public contract is required to perform any cardinal change.
A cardinal change has little or no impact on the contract duration or cost.
A breach can be grounds for terminating a contract if the breach is considered "_________". (What is the correct legal term?)
Material
Excessive
Serious
Severe
Significant
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started