Question
Aero Engineering uses a joborder costing system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now
Aero Engineering uses a joborder costing system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now $1,500 per direct labor hour. The design engineer thinks that this is illogical. The design engineer has stated the following:
Our accounting system doesn't make any sense to me. It tells me that every labor hour carries an additional burden of $1,500. This means that direct labor makes up only 6% of our total product cost, yet it drives all our costs. In addition, these rates give my design engineers incentives to design out direct labor by using machine technology. Yet, over the past years as we have had less and less direct labor, the overhead rate keeps going up and up. I won't be surprised if next year the rate is $2,000 per direct labor hour. I'm also concerned because small errors in our estimates of the direct labor content can have a large impact on our estimated costs. Just a 30-minute error in our estimate of assembly time is worth $750. Small mistakes in our direct labor time estimate really swing our bids around. I think this puts us at a disadvantage when we are going after business.
- Is the fact that Aero Engineering has factory overhead of problem?
- Why is a $1,500 per dlh factory overhead rate a problem?
- What do you think is a possible solution?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started