Question
Aexyer Marked out of FLOO Sad Sack and Strange Mitchell Limited produces a single product-premium wool sleeping bags Variable manufacturing overhead is applied to products
Aexyer Marked out of FLOO Sad Sack and Strange Mitchell Limited produces a single product-premium wool sleeping bags Variable manufacturing overhead is applied to products based on direct machine-hours The standard costs for one unit of product are as follows: Direct Material: 8 metres at $8.00 per metre $64.00 Destion Direct Labour: 1.5 hours at $20.00 per hour $30.00 Variable Manufacturing Overhead: 2.5 machine-hours at $18.00 per $45.00 hour Total Standard Variable Cost Per Unit $139.00 During the month of August, 84,000 units were produced. The actual costs incurred with August's operations were as follows: Direct Material Purchased: 698,000 metres Material Used in Production: 655,000 metres Direct Labour: 129,000 hours Variable Manufacturing Overhead Actual total machine-hours for August totalled 205,000. Total applied variable manufacturing overhead totalled $3,690,000. Required: Total Cost $5,688,700.00 $2,688,000.00 $3,570,000.00 1. Compute all the key variances for direct materials, direct labour, and variable manufacturing. If you require blank MS Excel space to prepare your answer click on the following link: Blank MS Excel File Remember any answer prepared in the MS Excel space must be 'cut and pasted' in the answer space below
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started