After analyzing the costs of various options for obtaining brackets, Ross White ( see Problems 6 . 2 7 through 6 . 2 9 )

After analyzing the costs of various options for obtaining brackets, Ross White (see Problems 6.27 through 6.29) recognizes that although he knows that lead time is 2 days and demand per day averages 10 units, the demand during the lead time often varies. Ross has kept very careful records and has determined lead time demand is normally distributed with a standard deviation of 1.5 units. (a) What Z value would be appropriate for a 98% service level? (b) What safety stock should Ross maintain if he wants a 98% service level? (c) What is the adjusted ROP for the brackets? (d) What is the annual holding cost for the safety stock if the annual holding cost per unit is $1.50? Reference Problem 6-29: Upon hearing that Ross White (see Problems 6-27 and 6-28) is considering producing the brackets inhouse, the vendor has notified Ross that the purchase price would drop from $15 per bracket to $14.50 per bracket if Ross will purchase the brackets in lots of 1,000. Lead times, however, would increase to 3 days for this larger quantity. (a) What is the total annual inventory cost plus purchase cost if Ross buys the brackets in lots of 1,000 at $14.50 each? (b) If Ross does buy in lots of 1,000 brackets, what is the new ROP? (c) Given the options of purchasing the brackets at $15 each, producing them in-house at $14.80, and taking advantage of the discount, what is your recommendation to Ross White? Reference Problem 6-28 Rose Whittoon Problem Rozwonte tacacancidochie darinianatharina thabrackote anda ch(b) If Ross does buy in lots of 1,000 brackets, what is the new ROP? (C) Given the options of purchasing the brackets at $15 each, producing them in-house at $14.80, and taking advantage of the discount, what is your recommendation to Ross White? Reference Problem 6-28: Ross White (see Problem 6-27) wants to reconsider his decision of buying the brackets and is considering making the brackets in-house. He has determined that setup costs would be $25 in machinist time and lost production time, and 50 braskets could be produced in a day once the machine has been set up. Ross estimates that the cost (including labor time and materials) of producing one bracket would be $14.80. The holding cost would be 10% of this cost. (a) What is the daily demand rate? (b) What is the optimal production quantity? (c) How long will it take to produce the optimal quantity? How much inventory is sold during this time? (d) If Ross uses the optimal production quantity, what would be the maximum inventory level? What would be the average inventory level? What is the annual holding cost? (e) How many production runs would there be each year? What would be the annual setup cost? (1) Given the optimal production run size, what is the total annual inventory cost? (g) If the lead time is one-half day, what is the ROP? Reference Problem 6-27: Ross White's machine shop uses 2,500 brackets during the course of a year, and this usage is relatively constant throughout the year. These brackets are purchased from a supplier 100 miles away for $15 each, and the load time is 2 days. The holding cost per bracket per year is $1.50 Inolta archChapter 6, Problem 28P Bookmark Show all steps: ON w were verwyo wery VEVCH M a rrunty wall (o) How many production runs would there be each year? What would be the annual setup cost? (f) Given the optimal production run size, what is the total annual inventory cost? (g) If the lead time is one-half day, what is the ROP? Reference Problem 6-27: Ross White's machine shop uses 2,500 brackets during the course of a year, and this usage is relatively constant throughout the year. These brackets are purchased from a supplier 100 miles away for $15 each, and the lead time is 2 days. The holding cost per bracket per year is $1.50(or 10% of the unit cost) and the ordering cost per order is $18.75. There are 250 working days per year. (a) What is the EOQ? (b) Given the EOQ, what is the average inventory? What is the annual inventory holding cost? (c) in minimizing cost, how many orders would be made each year? What would be the annual ordering cost? (d) Given the EOQ, what is the total annual inventory cost (including purchase cost)?(e) What is the time between orders? (1) What is the ROP? Step-by-step solution ch

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Project management the managerial process

Authors: Eric W Larson, Clifford F. Gray

5th edition

73403342, 978-0073403342

Students also viewed these General Management questions

Question

3. Housekeeping, such as watering plants or storing personal items

Answered: 1 week ago