Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Allu A 15-m-long culvert that has a projecting groove-end inlet is needed on a 2%slope with a free outfall. The elevation of the upstream invert

Allu

A 15-m-long culvert that has a projecting groove-end inlet is needed on a 2%slope with a free outfall. The elevation of the upstream invert is 100m, and the maximum headwater depth is 5m. a) What size concrete arch culvert (n=0.013,Kc=0.5)is needed to carry 6m3/sof water? b) Is the culvert operating under inlet or outlet control? c) If the tailwater depth changes to 0.3m, what is the flow control? d) If the tailwater depth changes to 3.3m, what is the flow control? e) Why does the flow control change or not

texted answers only no photos change?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Stage Managers Toolkit

Authors: Laurie Kincman

2nd Edition

1138183776, 978-1138183773

More Books

Students also viewed these General Management questions

Question

2. What role should job descriptions play in training at Apex?

Answered: 1 week ago