Question
AlluAn existing JPCP pavement is going to be rehabilitated with asphalt overlay with the following conditions. Determine the asphalt overlay thickness. a. Future design i.
AlluAn
existing JPCP pavement is going to be rehabilitated with asphalt overlay with the following conditions. Determine the asphalt overlay thickness. a. Future design i. Design ESAL: 50 million ii. Reliability R=90%, iii. Standard deviation: S0=0.35iv. PSI=1.5v. Drainage coefficient: 1.0b. Existing JPCP pavement: i. Slab thickness: 15 inches ii. No sign of durability issue iii. 8%slabs cracked iv. 100 unrepaired deteriorated transverse joints and cracks v. Deflection results: 1. d0: 2.34mils 2. d112: 2.2miles 3. d24:2.03mils 4. d36: 1.84mils vi. Load transfer efficiency: 65%
texted answers only no photos
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started