Al-Starne wese Mandard costs and provides the following information che con to view the Womation Al-Star locaties matching had to production based on standard direct labor hours Al-Star reported the flowing for 2018 chamber of produce 1000 activate that 5.000 Read the GD Requirement Compute the variable overtad cont de vins und fred overhead cont and volume van Begin with the variable whead cost and eficiency variances Select the required for the variable condicioney wances will whether schwance in favorable rate was oost SQ standard quantity Marathon Formula Variante VOH cost variance (AC-SCAD VOH efficiency variance TAQ-SOS Now compute the feed vihad cost and volume and select the required for computed overhead cost and volume and whether each variance is favorable) or unable to SQ standard Formula Variant FOH cost variance AFOH-Budged FOH FOR wolone variance - BudOHA POH Data table Requirement 2. Explain why the variances are bawatile or unavati The variable overhead cost variance because the actual cost per direct labore was Within the Wandard cost per direct labor hour Static budget var Start budget feed The variable whead officiency variance is W because management used direct ab hours than standard and variable disapplied nebesed on direct labor Static budget direct The fed overhead cost variance is because the total fled overhead cost was than the budgused for overhead Static budget Standard direct lab The fixed overhead volume variance is because oled overhead cost cent was W than the budgeted feed cost pred the following adulto 2010 actual umber of its produced 1.000 chevaut with borbe and we are vratio ad cost and the varianty we wance is for Wow Cocotty Town teed head cost and volume varians, and identity which variance in favor avere AAC, Grobit Data table than the standarde perdredhohou borhouts the standard and varied is applied income and labo So biet www.vestad State budget dead Static budget direct labore Statie de la units Standard direct for hours 12300 52,450 1.156 675 2 the mount budgeted for total dvd than the studied and cost Print Done Data table 0 $2,300 $3,450 Static budget variable overhead Static budget fixed overhead Static budget direct labor hours Static budget number of units Standard direct labor hours 1.150 hours 575 units hours per unit Print Done GE