Amesbury Construction assembles residential houses. It uses a job-costing system with two direct-cost categories (direct materials and direct labor) and one indirect-cost pool (assembly support).
Amesbury Construction assembles residential houses. It uses a job-costing system with two direct-cost categories (direct materials and direct labor) and one indirect-cost pool (assembly support). Direct labor-hours as the
allocation base for assembly support costs. In December 2016, Amesbury budgets 2017 assembly-support costs to be $8,500,000 and 2017 direct labor-hours to be 170,000. At the end of 2017, Amesbury
is comparing the costs of several jobs that were started and completed in
2017.
Read the
requirements2.
Requirement 1. Compute the(a) budgetedindirect-cost rate and(b) actualindirect-cost rate. Why do theydiffer?
Identify the formula to calculate the budgeted indirect cost rate and then calculate the rate.
(1)
/
(2)
=
Budgeted indirect cost rate
/
=
per DLH
Identify the formula to calculate the actual indirect cost rate and then calculate the rate.
(3)
/
(4)
=
Actual indirect cost rate
/
=
per DLH
These rates differ because
(5)
.
Requirement 2. What are the job costs of the Laguna Model and the Mission Model using(a) normal costing and(b) actualcosting?
(a) Identify the formula to calculate the indirect costs under normal costing and then calculate the indirect costs for each model.
(Normal costing)
(6)
x
(7)
=
Indirect costs
Laguna
per DLH
x
=
Mission
per DLH
x
=
Now calculate the total costs using normal costing for each model.
Laguna
Mission
Normal costing
model
model
(8)
(9)
Total costs
(b) Identify the formula to calculate the indirect costs under actual costing and then calculate the indirect costs for each model.
(Actual costing)
(10)
x
(11)
=
Indirect costs
Laguna
per DLH
x
=
Mission
per DLH
x
=
Now calculate the total costs using actual costing for each model.
Laguna
Mission
Actual Costing
Model
Model
(12)
(13)
Total costs
Requirement 3. Why might
Amesbury
Does construction prefer normal costing over actual costing?
Amesbury
Construction might prefer normal costing over actual costing because normal costing
(14)
Amesbury
can use this information to
(15)
1: Data Table
Laguna Model
Mission Model
Construction period
Feb-June 2017
May-Oct 2017
Direct materials costs
$106,430
$127,250
Direct labor costs
$36,740
$41,130
Direct labor-hours
920
1,080
Direct materials and direct labor are paid for on a contract basis. The costs of each are known when direct materials are used or when directlabor-hours are worked. The
2017
actualassembly-support costs were
$8,316,000,
and the actual directlabor-hours were
154,000.
2: Requirements
1.
Compute the(a) budgetedindirect-cost rate and(b) actualindirect-cost rate. Why do theydiffer?
2.
What are the job costs of the Laguna Model and the Mission Model using(a) normal costing and(b) actualcosting?
3.
Why might
Amesbury
Does construction prefer normal costing over actual costing?
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Requirement 1 Compute the a budgeted indirectcost rate and b actual indirectcost rate Why do they differ a Budgeted ...Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started