Amount Descriptions Schedule of Costs Unit Cost Instructions Linsenmeyer Company produces a common machine component for industrial equipment in three departments molding, grinding, and finishing. The following data are available for September: Molding Department $143.400 13,000 Direct materials Direct labor Grinding Finishing Department Department $15,200 $10,000 32,800 23,100 135,100 18,000 Applied overhead 17,500 During September, 1.300 components were completed. There is no boginning or ending WIP in any department Required: 1. Prepare a schedule showing, for each department, the cost of direct materias, direct labor, applied overhead, product transferred in from a prior department, and total manufacturing cost. 2. Calculate the unit cost. (Found the unit cost to two decimal places) Instructions Amount Descriptions Lir Se brinding, and finishing. The following data are Refer to the list below for the exact wording of an amount description within your schedule. Amount Descriptions Applied overhoad Costs added Direct labor Direct materials From Finishing From Grinding From Molding Total manufacturing cost Work in process product transferred in from 1 Instructions Schedule of Costs 1. Prepare a schedule showing for ouch department, the cost of direct materiais, direct inbox, applied overhead, product transferred in from a prior department and tota marunchining cost. Refer to the list of Amount Descriptions for the exact wording or text toms within your schedule. Linsenmeyer Company Schedule of Costs For the Month of September Molding Dept. Grinding Dept. Finishing Dept Transferred-in cost Schedule of Costs Unit Cost X 7. co2 Calculate the unit cost. Round the unit cost to two decimal places. The unit cost is per unit, applied overhead, product transferred in from a prior department and totalme pedule Ing Dept Finishing Dept. Transferred in cost