Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Amp Corporation has one support department, Engineering Services, and two production departments, Machining and Assembly. The following data relate to the 2020 budget for the
Amp Corporation has one support department, Engineering Services, and two production departments, Machining and Assembly. The following data relate to the 2020 budget for the Engineering Services Department: (Click the icon to view the budget data for 2020.) Read the requirements. 1. Using the single-rate method, calculate the cost to be allocated to the Machining and Assembly Departments if the allocation rate is based on budgeted costs and budgeted quantity of Engineering Services and allocated based on actual Engineering Services hours used in each department. 2. Using the dual-rate method, calculate the cost to be allocated to the Machining and Assembly Departments if (a) variable costs are allocated based on the budgeted variable cost per hour for actual hours used in each department and (b) fixed costs are allocated based on budgeted fixed costs per hour and the budgeted number of hours for each department. 3. Using the single-rate method, calculate the cost to be allocated to the Machining and Assembly Departments if the allocation rate is based on budgeted costs and practical capacity of the Engineering Services Department and allocated based on actual Engineering Services hours used in each department. 4. Using the dual-rate method, calculate the cost to be allocated to the Machining and Assembly Departments if (a) variable costs are allocated based on the budgeted variable cost per hour for actual hours used in each department and (b) the fixed-cost allocation rate is based on budgeted costs and practical capacity of Engineering Services Department and fixed costs are allocated based on budgeted Engineering Service hours in each department 16,000 hours $560,000 Practical capacity Fixed costs of the Engineering Services Department in the 12,000 labor-hour to 16,000 labor-hour relevant range Budgeted usage (quantity) of engineering services labor-hours required to support the productions departments: Machining department 5,000 hours 9,000 hours Assembly department 14,000 hours $25 per hour used Total Budgeted variable cost per engineering services labor-hour in the 12,000 labor-hour to 16,000 labor-hour relevant range Actual usage (quantity) of Engineering Services labor-hours required to support the production departments: Machining department 4,000 hours 8,000 hours Assembly department 12,000 hours Total
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started