Amy Xia s plant produces four different types of photo frames and this was designed to produce 2 , 1 5 0 frames in

Amy Xias plant produces four different types of photo frames and this was designed to produce 2,150 frames in total per day. They operate three shifts of eight hours each day.

a) Their daily average production during the month was 1,600 frames per day. What is the capacity utilization at this plant? (1 point)

b) When they investigated their operations, they realized that material delays led to some waste of time, and they rectified the issues to ensure on-time material availability. This led to an increase in their output to 1,700 units per day in the subsequent month. What is the capacity utilization now? (1 point)

c) The industrial engineering team at the plant analyzed the manufacturing process and have observed during the month of March that the changeovers between different models at this plant took about 25 mins per model changeover. They currently use a Solbridge International School of Business, BBA Section 2, Spring 2024 standard batch size of 90 frames per batch. Their standard processing time per frame is half a minute. What is the capacity utilization for March? (2 points)

d) If they wish to achieve a target utilization rate of 90 percent, how much reduction in changeover time is warranted assuming no changes in the standard batch size and the standard processing time. (2 points)

Step by Step Solution

3.48 Rating (151 Votes )

There are 3 Steps involved in it

Step: 1

Amy Xias Plant Capacity Utilization a Initial Capacity Utilization Total designed capacity per day 2150 framesday Average daily production 1600 framesday Capacity Utilization Rate CUR CUR Actual Outpu... blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Contemporary Engineering Economics

Authors: Chan S. Park

5th edition

136118488, 978-8120342095, 8120342097, 978-0136118480

More Books

Students also viewed these General Management questions