An 18.8 km long metro circle (ring) has 20 stations. It operates with a cycle time of 44 minutes and headways of 4 minutes. The

  1. An 18.8 km long metro circle (ring) has 20 stations. It operates with a cycle time of 44 minutes and headways of 4 minutes. The average train standing time is 31 seconds.
    1. It is planned to reduce the standing time so that the number of TUs can be reduced by one. What should the new average standing time be to allow operation of the same schedule by one less TU?
    2. Compute the operating speed on the line now and with the change above.
    3. New rolling stock is being designed. It has a higher performance operating speed on the line at 3.2 km/h over the speed above. Assuming the headway remains the same, compute the new cycle time and number of TUs required.
    4. For the same change as c, what would the new headway be if the number of TUs remains the same as in the old schedule?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction to Management Science

Authors: Bernard W. Taylor

11th Edition

132751917, 978-0132751919

More Books

Students also viewed these General Management questions