Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 8.9 minutes, and the standard deviation vas 1.09 minutes

image text in transcribed
image text in transcribed
image text in transcribed
An analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 8.9 minutes, and the standard deviation vas 1.09 minutes for a worker with a performance rating of 109 percent. Assume an allowance of 9 percent of job time. Find the standard time for this operation. (Do not round intermediate calculations. Round your final answer to 2 decimal places.) A job was timed for 60 cycles and had an average of 1.13 minutes per piece. The performance rating was 83 percent, and workday allowances are 8 percent. Determine each of the following: a. Observed time. (Round your answer to 2 decimal places.) b. Normal time. (Round your answer to 2 decimal places.) c. Standard time. (Round your answer to 2 decimal places.)

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting

Authors: Pauline Weetman

6th Edition

0273789252, 978-0273789253

More Books

Students also viewed these Accounting questions